Skip to main content
Paraguay flagParaguay · South America

Bitcoin Mining in Paraguay

Paraguay's advantage is not free hydropower. It comes from large hydro generation, relatively small domestic load and an ANDE framework for intensive users including crypto mining.

Public-source research Research update
market stage
Growing
Policy status
Conditionally open
Public sources
5
Last updated
Research snapshot

Three lenses before the details

These are navigation cues, not a profitability score or project recommendation.

5 public sources
Why mining can operate here

Large hydropower and ANDE's special high-load framework

Hydropower · structural surplus power · generation-side colocation

Can a project enter?
System
Conditional
electricity
difficult to obtain
Imports
Documents required
One-minute brief

Understand in one minute

First grasp the conditions for the establishment of this market, and then check the energy, policy, import and site details.

  1. 01

    Itaipu explains the energy background, while mining load still requires capacity and grid access through ANDE.

  2. 02

    ANDE places crypto mining inside the GCIE special intensive-consumption category.

  3. 03

    Published GCIE demand cannot be converted directly into live BTC hashrate.

  4. 04

    Formal contracted load and unauthorized connections coexist, so site-level verification matters.

  5. 05

    Future conditions depend on power capacity, grid construction and observable operations.

Past

The Past: How Mining Evolved

How policy, energy and large load conditions are formed step by step.

  1. Itaipu establishes the hydro base

    Itaipu created generation capacity far above Paraguay's early domestic demand and shaped later high-load industry.

    Source [1]
  2. Intensive load enters a special framework

    ANDE developed GCIE conditions for crypto mining, data processing and data centers at medium and high voltage.

    Source [2]
  3. Contracted demand and enforcement both grow

    ANDE reported growing GCIE demand while continuing enforcement against unauthorized mining connections.

    Source [3] [4]
Current state

Current situation: What is currently supporting the

Paraguay has a utility-recognized intensive mining load, but no reliable official statistic for national BTC hashrate or hosted machine count.

Source [3] [2] [4]
  • ANDE reported substantial GCIE contract demand in 2025.
  • Contract demand is not the same as online machines or network share.
  • Each site's power relationship and operations require separate verification.
Main deployment areas
Public activity follows areas with medium- or high-voltage ANDE access; this profile does not publish unverified mine addresses.
Primary Participant Types
ANDE special high-consumption users and corporate large loads
Mine type
Medium- and high-voltage halls, containerized air cooling and hydro sites coexist.
Commercial power acquisition
difficult to obtain
ASIC import procedure
Documents required
Industry maturity
The power framework is formalizing while service quality remains site-specific.
Energy model

Energy Model: Where does cheap electricity come from?

Low-cost potential comes from hydro and domestic demand structure, while miners use ANDE's special supply conditions rather than free Itaipu energy.

Source [1] [2]
HydropowerStructural hydro surplusGeneration-side colocation
  1. 01

    Itaipu output is large relative to domestic demand.

  2. 02

    GCIE covers capacity, voltage, metering and interruption conditions.

  3. 03

    Reserved capacity and site infrastructure matter beyond an energy-only figure.

  4. 04

    Transmission, substations and hydrology still affect availability.

Policy, tax & import

Policy, Taxation and Import

Final check of policy content:. This section is a summary of research and does not replace local legal and tax advice.

Source [2] [3] [4]
01Mining legality
ANDE formally recognizes crypto mining as an intensive load when operated under the applicable power rules; unauthorized connections face enforcement.
02Registration and Licensing
Large loads follow GCIE power, company, tax and site procedures.
03power restrictions
Capacity, metering, interruption and load-class rules apply.
04ASIC import
ASIC imports require local customs and equipment documentation; preserve serial and origin records.
05tax
Company, import, service and mining-income treatment depends on the operating structure.
06Foreign exchange and settlement
Overseas miners should confirm the actual payment route and currency handling for each service.
07Foreign investment restrictions
Foreign participation is possible, while power capacity and site rights remain project-specific.
08Asset exit
Relocation requires removal, storage, domestic transport and export steps.
Verified Developments

Major Policy and Energy Developments

Only events that can materially change mining operations, hosting terms or equipment-exit decisions are included.

Last Reviewed
  1. Energy Policy In effect

    Government repeals four energy-intensive convergent-industry decrees

    Paraguay repealed Decrees 5306, 5307, 5860 and 5861, which concerned policy and electricity arrangements for energy-intensive convergent industries. The government said ANDE would advance follow-up measures, but repeal alone does not mean every existing crypto-mining rule or individual contract ceased to apply.

    Impact on Hosting Decisions

    New hosting projects should not cite the repealed decrees as a current incentive. Existing projects must verify their ANDE customer class, valid contract, follow-up resolutions and renewal terms individually.

    Source [5]
Mine operations

Mine operating conditions

In addition to electricity prices, on-site conditions really affect the online rate, maintenance cycle and transition costs.

Temperature and humidity
Hot summers require headroom for derating, airflow and hydro-system backup.
Dust and cooling
Road and site dust can change filtration and cleaning intervals.
Connectivity
Check redundant links and remote control during outages.
Repair and parts
Local capability is growing, but board-repair quality and parts inventory vary.
Transport and security
Access control, serial audits and cargo insurance remain important.
Relocation
Keep machine intake and operating records and understand removal logistics.
National access framework

Can individuals and small operators participate lawfully?

Low: a lawful large-load route exists, but it requires ANDE supply and completed infrastructure.

This section evaluates only national rules, electricity-market structure and public regulations. Hosting-provider prices, minimum quantities and service terms are excluded.

Legality of Individual Self-Mining
No general individual ban was found; unauthorized power is enforced.
Company and Business Registration
Commercial projects need a local entity, tax status and formal power contract.
Commercial Power Access
ANDE approval, substations and capacity are central.
Small-Scale Residential Mining
Residential power cannot replace the high-consumption regime.
Self-Generation or Co-Located Generation
Generation needs energy, environmental, site and connection records.
ASIC import
Imports are possible with classification, tax and inland logistics review.
Pools and Cross-Border Payouts
Cross-border receipts need bank and tax records.
Foreign Participation
Foreign investors can use a lawful entity and power project.
Equipment Exit
Customs, tax-paid and ownership records affect exit.
Institutional Transparency
ANDE and Itaipu data are public; contracted demand is not operating Bitcoin capacity.
Scenarios

The future is not a single path

Use three scenarios to track energy, policy and operational variables without writing forecasts as definite answers.

Baseline scenario

Gradually evolve

Contracted GCIE load grows as ANDE continues to formalize high consumption.

optimistic scenario

Improved conditions

Grid investment and observable service standards improve access for smaller miners.

risk situation

pressure rises

Power changes, grid limits or enforcement interrupt sites faster than overseas machines can move.

Scale & retail hosting

From small self-operated to large-scale mining, who can get in?

Paraguay has a clearer mid- and large-scale route because ANDE recognizes crypto mining as intensive load; that does not give a retail miner the same power conditions.

Source [2] [3] [4] [1]
01
Limited

Small self-mining

Residential or small units may exist, while formal industrial power, heat and local wiring cannot be inferred.

02
Viable

Mid-sized facility

GCIE, compliant metering and medium/high-voltage service can support facilities; substations and capacity remain barriers.

03
Growing

Large mine

Large contracted loads and professional sites exist, but contracted demand is not all energized or online.

Why can the project be entered?

Large hydropower, relatively small domestic load and ANDE's intensive-user framework create a formal application and supply route.

Current status of retail custody

Overseas-facing services are visible, without an official hosting register. The customer-facing brand may not hold the ANDE account or site.

still have to overcome
  • Verify the ANDE account, GCIE contract and physical site
  • Verify serials, pool, outages, repairs and power interruptions
  • Confirm removal, domestic transport and re-export before entry

This describes the market structure at the country level and does not represent any host recommendation, availability, price or service commitment.

Sources

Source

Public research and JGM field records are deliberately separated to prevent a single cooperation or service relationship from affecting the neutral judgment of the country page.

Open research sources

The country text, comparison tags, policy and energy analysis above only use this set of sources.

  1. 01

    Itaipu generation and supply data for the first half of 2025

    Itaipu Binacional · 2025-07-08

    Energy context for understanding relative local demand for large hydropower, not equal to miner available capacity. (View: 2026-07-23)
  2. 02

    Resolution P/No. 49238: GCIE special power conditions

    Administración Nacional de Electricidad (ANDE) · 2024

    Contracts, margins, capacity and power supply conditions for high-load users such as crypto mining and data centers. (View: 2026-07-23)
  3. 03

    ANDE public update on Bitcoin and the energy market

    Administración Nacional de Electricidad (ANDE) · 2025-09-16

    ANDE announces GCIE contract requirements; numbers cannot be regarded as actual BTC hashrate. (View: 2026-07-23)
  4. 04

    ANDE enforcement against unauthorized mining power use

    Administración Nacional de Electricidad (ANDE) · 2025-08-04

    Used to illustrate that legal power contracts and illegal power connections must be separated. (View: 2026-07-23)
  5. 05

    Government repeals the convergent-industries power framework

    Palace of the President of the Republic of Paraguay · 2026-06-09

    Official confirmation of the revocation of Decree Nos. 5306, 5307, 5860 and 5861; the rates or periods in the revoked frameworks can no longer be regarded as current trusteeship conditions. (View: 2026-08-09)
Update log

Update record

first release
Last updated
This update
Added a major policy and energy developments section with explicit event status, hosting impact and public sources.
  1. Added major policy and energy developments, separated from JGM Learn's editorial update history.

  2. Rechecked public sources and links; added national-system access, commercial-power difficulty, participant types and primary risk.

  3. Initial profile with GCIE rules, official demand context and operating checks.

Country-by-country and site-by-site verification

Do not use national averages in place of project conditions

Return to the Country Comparison and Policy page, first look at institutional thresholds, commercial power and ASIC imports, and then check actual sites, contracts and equipment withdrawals.