Global Mining Policy

Comparison of global mining policies

Overseas miner hosting cannot only depend on electricity prices. Legality, power restrictions, ASIC imports, taxation, foreign exchange and asset withdrawals are all judged together with local energy conditions.

Policy status
Not a legal/illegal choice
data policy
Policy date and source are marked separately
Interpretation range
Electricity, import, tax, exit
Global policy radar

Major changes in markets still under research

These developments meet the publication threshold, but the full country files are not ready. They are shown separately so a new rule is not mistaken for a complete assessment of the market.

Last Reviewed
Uzbek flag
Country file in research

Uzbekistan

In effect

Besqala Mining Valley moves from establishment into implementation

PP-143 of April 17 established a special mining zone in Karakalpakstan. Implementation rules registered on July 8 as No. 3893 set out resident registration, mining permits, supervision and disposal of mined assets. Approved legal entities in the zone may use the unified grid and renewable sources under the regime, with mining-related tax and fee relief running through January 1, 2035.

Impact on Hosting Decisions

This is a special-zone regime, not open grid access throughout Uzbekistan. Hosting still requires verification of zone residency, the NAPP permit, actual power route, contract and equipment-exit terms.

Public sources
pakistan flag
Country file in research

Pakistan

Act in force · rules pending

New law distinguishes own-account mining from services involving customer assets

The Virtual Assets Act, 2026 took effect at once upon publication. Section 37 says mining solely for one's own account is not itself a licensable virtual-asset service, while a mining operation involving customer assets or customer funds may fall within licensed services. PVARA may later set registration or reporting thresholds based on scale, electricity use or hashrate; no effective fixed threshold was located at the review date.

Impact on Hosting Decisions

Retail hosting or managed mining should not rely automatically on the own-account exception. Verify whether the provider controls customer assets or funds, what services it actually performs and the final licensing and registration rules.

Public sources
Chinese flag
Country file in research

China

In effect · baseline update

Inter-agency notice continues and strengthens the existing mining crackdown

The joint notice continues the policy in place since 2021, directing authorities to identify and close existing mining projects, prohibit new projects and bar mining-machine manufacturers from providing machine sales and related services inside China. This is an updated and strengthened baseline, not the first nationwide mining ban in 2026.

Impact on Hosting Decisions

Mainland China should not be treated as a deployable market. Equipment procurement and transfers also require review of domestic sales-service restrictions, without assuming that every export or overseas after-sales activity is prohibited.

Published three days before the strict six-month window; retained because it directly affects mining and the mining-equipment supply chain.
Public sources
Kyrgyz flag
Country file in research

Kyrgyzstan

Status confirmed

Regulator's annual report confirms domestic mining remains suspended

Kyrgyzstan's financial-market regulator stated in its 2025 virtual-assets report that domestic mining activity was suspended and registered miners had filed zero reports since December 2025. February 10 is the report's publication date, not the effective date of a new ban.

Impact on Hosting Decisions

Historical hydropower conditions, company registration or an old license do not establish current operability. Deployment requires a formal resumption basis, an active power arrangement and site-level approvals.

Public sources
Search by region

Seven regions, seven different policy contexts

The regional page integrates energy and industry background; this page focuses on regulation, imports and asset exits.

Completed policy file

Review Each Country—Do Not Substitute National Averages for Project Conditions

The following content is generated directly from global mining country data; policies are dated, and limitations are reserved when there are no reliable answers.

brazil flag
South America·Brazil

Brazil

Conditionally open
Mining legality
No federal blanket ban was identified; virtual-asset, power, environmental, corporate and local requirements must be assessed separately.
power restrictions
Grid capacity, connection, market and dispatch rules apply; curtailed generation is not unconditional mining supply.
ASIC import
ASIC shipments follow general commercial import, classification and tax processes and should be checked per shipment.
Asset exit
Resale and re-export depend on equipment condition, customs records, logistics and the local secondary market.
Paraguay flag
South America · Paraguay

Paraguay

Conditionally open
Mining legality
ANDE formally recognizes crypto mining as an intensive load when operated under the applicable power rules; unauthorized connections face enforcement.
power restrictions
Capacity, metering, interruption and load-class rules apply.
ASIC import
ASIC imports require local customs and equipment documentation; preserve serial and origin records.
Asset exit
Relocation requires removal, storage, domestic transport and export steps.
American flag
North America · United States

United States

Conditionally open
Mining legality
No federal blanket ban exists, while state, local, environmental, noise, land and power rules may restrict specific sites.
power restrictions
Large loads may require interconnection studies and grid-management arrangements.
ASIC import
Supply chains are developed, but tariffs, origin and customs treatment should be checked at import time.
Asset exit
A large secondary market helps, but liens, financing and operator insolvency can affect machine recovery.
canadian flag
North America·Canada

Canada

Conditionally open
Mining legality
Canada has no federal blanket ban on mining. Corporate, land-use, power and environmental requirements apply by province, municipality and project.
power restrictions
Utility connections and new large-load rules vary by province. Alberta on-site plants also have to meet AUC approval conditions.
ASIC import
ASICs and power equipment must be declared under Canadian customs, origin, tax and safety requirements; classification depends on shipment documents.
Asset exit
Logistics and secondary markets are relatively developed, but liens, arrears, security interests and removal delays must be excluded before entry.
ethiopia flag
Africa·Ethiopia

Ethiopia

Unclear
Mining legality
Official EEP material confirms that data or crypto mining can exist under specific supply arrangements; this does not open every crypto activity.
power restrictions
Operator disclosures of persistent power constraints and Canaan’s paused Ethiopian operations shift the focus to effective output, downtime billing and equipment exit. Read national context separately from individual sites.
ASIC import
ASIC and power-equipment imports depend on foreign exchange, customs and local documentation.
Asset exit
Re-export, foreign-exchange records, customs and logistics can make exit slower than entry.
Russian flag
Russia, Caucasus and Central Asia·Russia

Russia

Conditionally open
Mining legality
Digital-currency mining can operate under federal registration, reporting and regional rules; it is neither nationally unrestricted nor nationally banned.
power restrictions
Read geographic bans alongside category-four connection rules. Resolution 1300 introduces conditional exceptions, excluding non-price zones, special electricity-market regimes, specified differentiated transmission tariffs and separately listed special-regime territories. Category-four status does not automatically open every banned area; site and connection documents remain necessary.
ASIC import
Export controls, origin, international logistics and Russian customs can affect ASIC and parts movement.
Asset exit
Long-distance relocation, re-export and secondary sale may take longer; clarify handover and logistics before entry.
Kazakh flag
Russia, Caucasus and Central Asia · Kazakhstan

Kazakhstan

Conditionally open
Mining legality
Digital mining may operate under the Digital Assets Law, licensing and power rules; unlicensed or non-compliant activity is not equivalent.
power restrictions
Sites require commercial metering, communications and controllable load; dispatch, regional balance and technical connection terms apply.
ASIC import
ASICs, transformers and parts require EAEU/Kazakh customs, conformity, origin and shipment-level review.
Asset exit
Ownership, site debt, customs and re-export records govern removal, with long inland routes adding time.
indonesia flag
Asia · Indonesia

Indonesia

Unclear
Mining legality
Official tax rules recognize mining-related services and no national blanket ban was identified, but there is no dedicated mine license that replaces company, power, building and environmental requirements.
power restrictions
Supply must use a lawful contract, meter and connection. Electricity theft can create criminal exposure, seizure and shutdown.
ASIC import
ASICs, power supplies and cooling systems require shipment-specific customs classification, taxes and potential technical-standard review.
Asset exit
Removal depends on ownership, import records, taxes, inter-island logistics and any enforcement hold, so exit planning belongs before entry.
Georgia flag
Russia, Caucasus and Central Asia · Georgia

Georgia

Conditionally open
Mining legality
No nationwide self-mining ban was found. Ordinary company, tax, energy, construction, environmental and power-use rules still apply.
power restrictions
Access follows energy law, distribution and market rules, and actual capacity. Free-zone status does not create automatic power rights.
ASIC import
ASICs require the correct Revenue Service commodity code based on description, specification, condition and customs value. This page does not assume a tariff code or rate.
Asset exit
Import, serial, tax-paid and ownership records shape resale or re-export.
oman flag
Middle East · Oman

Oman

Conditionally open
Mining legality
Official sources show an approved mining data-center pilot can operate; no special mining license open to every individual was found.
power restrictions
Large loads need capacity from the applicable system and supplier; self-generation has an APSR licensing route.
ASIC import
ASIC and cooling equipment treatment depends on customs classification, origin, free-zone status and VAT. No single rate is assumed.
Asset exit
Free-zone status, customs territory, re-export and ownership records shape asset exit.
argentina flag
South America·Argentina

Argentina

Conditionally open
Mining legality
No national Bitcoin-mining ban was found. General business, tax, energy, environmental and provincial rules apply.
power restrictions
Large-user and distribution conditions vary across the MEM and provinces. Tierra del Fuego has specific treatment for mining load.
ASIC import
ASICs require ARCA classification, importer status, equipment-condition, payment and current import-rule checks; no fixed national duty is assumed.
Asset exit
Customs, tax-paid, serial, ownership and FX-payment records shape resale and re-export.
south africa flag
Africa·South Africa

South Africa

Conditionally open
Mining legality
The official IFWG FAQ states that crypto-asset mining is allowed, subject to tax and exchange-control law.
power restrictions
Loads follow supplier, distributor and network rules; generation, trading and network activities follow ERA, NERSA licensing/registration and technical codes.
ASIC import
New equipment follows SARS classification. Used electronics may require an ITAC permit, with EPR/e-waste duties reviewed separately.
Asset exit
Condition, tax-paid status, ITAC permits, serial and ownership records shape resale or export.
Before starting deployment

5 questions miners ask

  1. 01Are the power supply conditions stable? Under what circumstances will power be adjusted or limited?
  2. 02Can the ownership, serial number, revenue address and location of the miner correspond?
  3. 03How are responsibilities and expenses divided in the event of malfunctions, power outages, or policy changes?
  4. 04What are the processes and costs for delisting, transferring, selling or re-exporting?
  5. 05Can the service window clearly explain the site, operation and maintenance, and equipment handover procedures?
Next Steps

Policy risks should also be included in the income model

The quality of overseas hosting cannot only be judged by the electricity bill. Power supply, maintenance, transition and exit conditions will determine whether the risk is controllable.