Skip to main content
Revenue and Cost Guide

Bitcoin Mining Cost Calculator: Revenue, Electricity and Shutdown Rates

This page only deals with a single miner: how many BTCs were mined, how much electricity was used, as well as the daily net amount under current conditions, the shutdown BTC currency price and the static payback period. Deposits, downtime billing and exit terms are dealt with separately on the hosting comparison page.

Last updated: · JGM Learn Editorial Department

Interactive Calculator

Mining Cost Calculator

Choose a miner, then enter the four conditions that most directly affect its daily operating result.

Revenue DataLatest Available Snapshot
Unit yield timestamp: BTC price timestamp: Source:Blockchair 24h network stats and head · CoinGecko
AlgorithmSHA-256BTC
Electricity Price Shortcuts
Avoid double counting

If average hashrate already includes downtime, set uptime to 100%. If wall power already includes electrical losses and cooling, set additional power overhead to 0%.

Gross BTC Network Yield Before Pool Fee

Estimate Results

Estimated operating balance/day
Updating…
BTC/day after pool fees and uptime
Updating…
Actual electricity cost/day
Updating…
Theoretical shutdown BTC currency price
Updating…
View full calculation details
Theoretical BTC/day
Updating…
BTC/day after pool fees
Updating…
Adjusted daily revenue
Updating…
Rated power
Updating…
Power including extra load
Updating…
Fully loaded daily electricity consumption
Updating…
Daily energy adjusted for uptime
Updating…
Estimated 30-day electricity cost
Updating…
Estimated 30-day operating balance
Updating…
2026-11-19

Three-miner operating snapshot

Generated with the same calculation core at 0.06 USD/kWh, a 4% pool fee, 3% extra power and 95% uptime.

ModelHashrateEfficiencyDaily electricity consumptionDaily BalanceShut down BTC currency price
Antminer S19 K Pro 120 TH/s 23 J/TH 64.8 kWh -USD 0.67 USD 76,307 / BTC
Antminer S21 XP 270 TH/s 13.5 J/TH 85.6 kWh USD 2.11 USD 44,789 / BTC
Antminer S23 305 TH/s 11 J/TH 78.8 kWh USD 3.45 USD 36,494 / BTC
First break down the two basic numbers

The hashrate determines how much is mined, and the power consumption determines how much electricity is used.

The higher the hashrate, the higher the long-term expectation of block rewards is usually; the higher the power consumption, the more electricity is required per hour. When comparing two miners, you should not just look at TH/s, but also how many watts are required per unit of hashrate.

Theoretical Daily BTCHashrate × daily output per unit of hashrate

Calculated first at 100% uptime before deducting the effective pool fee.

Fully loaded daily electricity consumptionSite power consumption ÷ 1000 × 24

For site power consumption, you must first confirm whether line loss or other additional power consumption is included.

Calculate the cost first

Daily Miner Electricity Cost Formula

Daily electricityPower W ÷ 1,000 × 24 hours × electricity rate

For example, if you enter 3,000 W, the calculator will first change it to 3 kW, and then multiply it by the operating time and the price of electricity per kilowatt hour. This is just the cost of electricity; fixed monthly fees, maintenance, taxes and equipment depreciation don't automatically appear in it.

Power Measurement Basis

Why nominal power consumption and billed power consumption are different

The original factory nominal power consumption usually describes the power consumption of the device under specified conditions; the power consumption on the wall or in the bill may already include power efficiency, line loss and site equipment. First confirm which layer the number in your hand is, and then decide what costs will be added later.

Extra power consumption

How to calculate line loss, cooling and water pump

If there is only the power consumption of the miner itself, you can add line loss, fans, water pumps or cooling pools based on actual and verifiable site conditions; if the input is already the power consumption of the wall or the meter, set the additional power consumption to 0% to avoid repeated additions of the same amount of electricity.

Input body power consumption

You can add an actual verifiable line loss or additional power consumption at the site.

Enter wall power consumption

If the above power consumption has been included, set the additional power consumption to 0% to avoid double calculation.

running time

How Uptime Affects Both Output and Electricity Cost

When runtime falls, BTC output usually falls as well. Under actual-use billing, energy use also decreases; under full-load or reserved-capacity hosting, the bill may not fall with uptime.

Average hashrate used? If average hashrate already includes downtime, set uptime to 100% so downtime is not applied twice.

Revenue Basis

When will the effective mining pool fee be deducted and how to avoid repeated deductions?

First check whether the BTC yield is gross or already net of pool fees. Only gross yield should be multiplied by “1 − effective pool fee.” If the source has already deducted the fee, it must not be deducted again. The shared calculation core handles this distinction.

FAQ

Frequently asked questions

How Do You Calculate a Miner's Daily Electricity Cost?

First divide the power consumption by 1000 to convert it into kW, then multiply by 24 hours and the price of electricity per kilowatt hour. If the power consumption of the miner is entered, it is necessary to confirm whether there is any line loss or cooling power consumption based on the actual site.

How to calculate the price of BTC when the theory shuts down?

Divide the daily electricity cost under current conditions by the daily BTC production after deducting the mining pool fee and online rate, and you can get the theoretical shutdown BTC currency price that only takes into account the electricity cost. It does not automatically include repairs, fixed charges and depreciation.

Does electricity cost always fall in proportion to uptime?

Not necessarily. Under actual-use billing, electricity cost usually falls with uptime. Under full-load or reserved-capacity billing, output falls while the bill may remain unchanged.

Can the static payback period be used as a future prediction?

No. A static payback period holds the current inputs constant and performs a simple calculation. It does not predict coin price, difficulty, repairs, downtime, depreciation or future rates.