Skip to main content
JGM Learn Industry Data Card
Product launchLaunched✓ Official sources checked

Bitdeer|SEALMINER DL1 Hydro

Bitdeer launched the hydro-cooled Scrypt SEALMINER DL1 Hydro on June 1. It is not a BTC SHA-256 miner.

Activity / Release Date
2026/06/01
Data Card Published
2026/08/31
Last verified
2026/10/28
Current status
LaunchedAwaiting delivery evidence
What Happened

What happened

Checked October 28, 2026 (Taipei, +08:00): the June 1 release and DL1 pages describe a Scrypt hydro miner rated at 52.5 GH/s, 149 J/GH, 7,823 W and 2U. The overview still says Launching soon; its Learn More link leads to a DL1 product body saying Stay tuned. The readable content provides no order control or explicit shipping date.

Verified Facts

Confirmed facts

These fields contain only information directly supported by sources. Manufacturer claims and unrealized expectations are labeled separately.

Launch date
2026/06/01
source 01
Algorithm and cooling
Scrypt | Hydro cooling
source 0103
Manufacturer-listed specifications
52.5 GH/s|149 J/GH|7,823 W
Manufacturer statementsource 0103
Compatible coins named by the manufacturer
LTC、DOGE、BELLS、JKC、LKY、PEP
source 0103
Product-page status
October 28, 2026: overview Launching soon; DL1 product body Stay tuned; ordering and delivery window unconfirmed
source 0304
Manufacturer deployment specifications
2U; inlet coolant 20–60°C; site cooling and power require verification
Manufacturer statementsource 0103
Manufacturer order terms
October 28 product guide: shipment ordered by full payment; no cancellation, exchange or refund; not delivery evidence
Company expectation; not yet an achieved resultsource 04
Verifiable manufacturer price
Unknown: the reviewed DL1 product body provides no model-specific numerical quote; navigation prices for other products cannot be substituted. This does not establish order availability, discontinued sales or sold-out stock. The source-review scope remains the October 28, 2026 record.
Manufacturer statementsource 0304
Miner Impact

What does it mean for miners?

DL1 Hydro targets high-density Scrypt sites. The overview lists inlet coolant at 20–60°C; roughly 7.8 kW per unit, cooling loops, coolant and operating conditions require separate checks. It does not belong in BTC miner revenue or SHA-256 efficiency comparisons.

JGM Learn Analysis

Analysis of this site

The product guide schedules shipment by full-payment order and disallows cancellation, exchange or refund; these terms provide no DL1-specific delivery window. The cited September operations update, published October 19, provides no DL1 delivery evidence. Other SEALMINER shipments or BTC self-mining figures cannot establish DL1 delivery. Status remains launched, with delivery evidence pending. This is not investment advice.

This section is JGM Learn's neutral interpretation of the listed sources. It is not manufacturer copy and does not guarantee returns, delivery or investment outcomes.
Primary Sources

Sources and Verification Record

Sources prioritize manufacturer websites, investor-relations releases and first-party event records. A source date is not necessarily the event date.

  1. 01
    Bitdeer Launches SEALMINER DL1 Hydro Achieving 52.5 GH/s and 149 J/GH Power EfficiencyGo to original source ↗

    Bitdeer Technologies Group · Investor Relations Announcement · 2026/06/01

    Accessed: 2026/10/28
  2. 02
    Bitdeer Announces May 2026 Production and Operations UpdateGo to original source ↗

    Bitdeer Technologies Group · Investor Relations Announcement · 2026/06/18

    View: 2026/08/31
  3. 03
    SEALMINER DL1 Hydro — High-Density Scrypt MinerGo to original source ↗

    Bitdeer · Official product page

    Accessed: 2026/10/28
  4. 04
    DL1 Hydro product body and purchasing guideGo to original source ↗

    Bitdeer · Official product page

    Accessed: 2026/10/28
  5. 05
    Bitdeer Announces September 2026 Production and Operations UpdateGo to original source ↗

    Bitdeer Technologies Group · Investor relations announcement · 2026/10/19

    Accessed: 2026/10/28
Update Record

Update and Correction Record

  1. The launch date was corrected from the June 18 operations-update date to June 1, 2026 based on the dedicated official release.
  2. Removed the Stay tuned label belonging to another product's navigation. Retained Launching soon from the DL1 content without inferring delivery from elapsed time.
Cite this page

Copy the Chinese citation, English citation or permanent URL.

  • The confirmed facts on this page are compiled from the listed original sources.
  • JGM Learn analysis is original editorial analysis by this site.
  • Manufacturer logos, product images and third-party visuals are not covered by this site's text and data citation permission.