Skip to main content
Delivery evidence comparison

Hydro Mining Hardware 2026: Delivery Evidence

As of each source card’s verification date below, all three still lack actual-delivery evidence and cannot be marked as arrived. S23 XP Hyd. shipping windows and AR30/AR31 lead times are manufacturer forecasts; DL1 ordering and a specific delivery window remain unconfirmed. Announcements, order terms, expected shipment and actual delivery are distinct; elapsed time or purchase terms alone do not upgrade a status.

Written and compiled by: JGM Learn Editorial TeamLast edited:(Taipei time)

This compares delivery evidence, not purchase recommendations, prices or miner reviews. DL1’s Scrypt GH/s and J/GH cannot be ranked against BTC SHA-256 TH/s and J/TH. AR30/AR31 are cabinets, not miners with a per-miner efficiency rating.

A page compilation update is not a new source verification. Verification and next-review dates come directly from the cards. Original publication/access dates remain below; older store and article receipts have not been refreshed to today.

Delivery evidence comparison

Hydro delivery-evidence comparison, not an efficiency, revenue or price ranking
Equipment and related pagesManufacturerManufacturer specifications / scopeCooling and deploymentAnnouncement and delivery evidenceSources and data datesNext review
S23 XP Hyd.SHA-256 / BTC minerMiner specifications BITMAIN

October 28 check of the August 28 post: up to 600 TH/s, as low as 8.9 J/TH; 5,340 W is a September 8 product-page record

Manufacturer hydro product; site cooling and power were not fully reverified in this review. See the source card’s limits.

Announcement progress:Launched

Delivery evidence:Awaiting delivery evidence

Launch post checked October 28: November 2026–January 2027 is a forecast, not spot-stock evidence; no actual-delivery evidence provided

Card verified:

Dates for each sourceS23 XP Hyd.: Official WDMS launch and expected delivery
SEALMINER DL1 HydroScrypt miner, not BTC SHA-256Miner specifications Bitdeer

52.5 GH/s|149 J/GH|7,823 W

Scrypt | Hydro cooling

2U; inlet coolant 20–60°C; site cooling and power require verification

Announcement progress:Launched

Delivery evidence:Awaiting delivery evidence

October 28, 2026: overview Launching soon; DL1 product body Stay tuned; ordering and delivery window unconfirmed

Card verified:

Dates for each sourceSEALMINER DL1 Hydro — High-Density Scrypt MinerDL1 Hydro product body and purchasing guide
ANTRACK AR30 / AR31Hydro cabinets / infrastructure, not individual minersCompatible U2H miner (not cabinet specifications) BITMAIN

Both: 20 U2H / 47U; verify the actual configuration

Cabinet capacity; per-miner hashrate / J/TH does not apply. Miner, piping and installation inclusions require verification.

AR30 uses existing cooling; AR31 adds a separate dry cooler and heat recovery. The 50°C outlet is manufacturer-rated; verify actual site conditions

Announcement progress:Announced

Delivery evidence:Awaiting delivery evidence

Checked November 1: 45 business days after payment on the website; within 45 business days after ordering in official posts. Neither proves delivery

Card verified:

Dates for each sourceOfficial AR30/AR31 article: payment-based shipping and outlet specificationOfficial AR30 deployment postOfficial AR31 deployment post

Manufacturer evidence and verification limits

The following are manufacturer-source records, not Learn measurements. Forecasts and claims retain their original card labels.

S23 XP Hyd.

Full source card and verification limits

Manufacturer-rated version
October 28 check of the August 28 post: up to 600 TH/s, as low as 8.9 J/TH; 5,340 W is a September 8 product-page record
Manufacturer statementsource 0102
Manufacturer-expected shipping
Launch post checked October 28: November 2026–January 2027 is a forecast, not spot-stock evidence; no actual-delivery evidence provided
Company expectation; not yet an achieved resultsource 01

The reviewed launch post gives a forecast without named-batch, inventory or arrival evidence; delivery evidence remains pending. An unreadable store does not establish discontinued sales or sold-out stock. Deployment parameters, payment conditions, delivery batches and arrival arrangements need official documentation. Lower J/TH does not guarantee payback. This is not investment advice.

  1. 01
    S23 XP Hyd.: Official WDMS launch and expected deliveryGo to original source ↗

    BITMAIN · Official press release · 2026/08/28

    Accessed: 2026/10/28
  2. 02
    S23 XP Hyd. official store: 600T presale versionGo to original source ↗

    BITMAIN · Official product page

    Accessed: 2026/09/08

SEALMINER DL1 Hydro

Full source card and verification limits

Manufacturer-listed specifications
52.5 GH/s|149 J/GH|7,823 W
Manufacturer statementsource 0102
Algorithm and cooling
Scrypt | Hydro cooling
source 0102
Manufacturer deployment specifications
2U; inlet coolant 20–60°C; site cooling and power require verification
Manufacturer statementsource 0102
Product-page status
October 28, 2026: overview Launching soon; DL1 product body Stay tuned; ordering and delivery window unconfirmed
source 0203
Manufacturer order terms
October 28 product guide: shipment ordered by full payment; no cancellation, exchange or refund; not delivery evidence
Company expectation; not yet an achieved resultsource 03

The product guide schedules shipment by full-payment order and disallows cancellation, exchange or refund; these terms provide no DL1-specific delivery window. The cited September operations update, published October 19, provides no DL1 delivery evidence. Other SEALMINER shipments or BTC self-mining figures cannot establish DL1 delivery. Status remains launched, with delivery evidence pending. This is not investment advice.

  1. 01
    Bitdeer Launches SEALMINER DL1 Hydro Achieving 52.5 GH/s and 149 J/GH Power EfficiencyGo to original source ↗

    Bitdeer Technologies Group · Investor Relations Announcement · 2026/06/01

    Accessed: 2026/10/28
  2. 02
    SEALMINER DL1 Hydro — High-Density Scrypt MinerGo to original source ↗

    Bitdeer · Official product page

    Accessed: 2026/10/28
  3. 03
    DL1 Hydro product body and purchasing guideGo to original source ↗

    Bitdeer · Official product page

    Accessed: 2026/10/28

ANTRACK AR30 / AR31

Full source card and verification limits

Manufacturer-rated capacity
Both: 20 U2H / 47U; verify the actual configuration
Manufacturer statementsource 0102
Cooling requirements
AR30 uses existing cooling; AR31 adds a separate dry cooler and heat recovery. The 50°C outlet is manufacturer-rated; verify actual site conditions
Manufacturer statementsource 010203
Shipping-period starting point
Checked November 1: 45 business days after payment on the website; within 45 business days after ordering in official posts. Neither proves delivery
Company expectation; not yet an achieved resultsource 030102

The article states shipment 45 business days after payment; official posts say within 45 business days after ordering. Both clocks are retained without assuming one supersedes the other. Confirm the starting point, equipment list, transport and arrival arrangements in the written order. Announcements and shipping expectations do not prove batch delivery. Heat recovery is not assumed income; this is not investment advice.

  1. 01
    Official AR30 deployment postGo to original source ↗

    BITMAIN · Official Release

    Accessed: 2026/11/01
  2. 02
    Official AR31 deployment postGo to original source ↗

    BITMAIN · Official Release

    Accessed: 2026/11/01
  3. 03

Learn interpretation: without named-batch, logistics/acceptance or arrival documents, announcements, ordering and shipping promises do not establish delivery. An unreadable manufacturer page also does not prove discontinued sales, sold-out stock or delivery.

What to verify before hydro deployment

This is a general engineering checklist, not evidence that equipment passed site acceptance and not a supplier recommendation. Verify the exact version, site design and written contract.

  • Cooling: verify inlet/outlet temperatures, flow, pressure differential, connections, heat exchangers and redundancy. Separate the cabinet loop from site heat rejection; “hydro” does not establish drop-in compatibility.
  • Coolant and water quality: obtain manufacturer documents for allowed media, pH, conductivity and maintenance. Confirm filtration, corrosion/freeze protection and leak handling; do not transfer another model’s limits.
  • Power density: verify voltage, phases, protection, grounding and capacity. Cabinet capacity is not proof of continuous site power, and heat recovery is not assumed revenue.
  • Hosting and delivery: confirm site support, inclusions, transport/installation duties, commissioning acceptance, warranty and downtime terms in writing. Check invoices, shipment notices and actual arrival evidence separately.

Use delivery evidence in deployment decisions

Verify the exact version and arrival documents in the source cards, then read the hosting and miner-selection guides. This is not investment advice or a guarantee of lead time, availability or payback.

Read Learn hosting due diligence

How to choose a Bitcoin miner · Mining Manufacturer Updates