Skip to main content
JGM Learn Industry Data Card
Product updateAnnounced✓ Official sources checked

BITMAIN | Choosing AR30 or AR31 Hydro Deployment

Both are rated for 20 U2H miners. AR30 connects to existing cooling; AR31 adds a separate dry cooler and heat-recovery support. Compare site requirements first.

Activity / Release Date
2026/09/10
Data Card Published
2026/09/24
Last verified
2026/11/01
Current status
AnnouncedAwaiting delivery evidence
What Happened

What happened

On November 1, 2026, we reread BITMAIN’s September 22 article and official deployment posts. Both cabinets are rated at 47U, 200 kW, 380–480 V and capacity for 20 U2H miners. The article body is readable in this check, not newly published today. The September 10 sales announcement and September 24 card publication remain historical dates. This public card focuses on deployment requirements, without direct-sale prices or promotions.

Verified Facts

Confirmed facts

These fields contain only information directly supported by sources. Manufacturer claims and unrealized expectations are labeled separately.

Manufacturer-rated capacity
Both: 20 U2H / 47U; verify the actual configuration
Manufacturer statementsource 0102
Cooling requirements
AR30 uses existing cooling; AR31 adds a separate dry cooler and heat recovery. The 50°C outlet is manufacturer-rated; verify actual site conditions
Manufacturer statementsource 010203
Shipping-period starting point
Checked November 1: 45 business days after payment on the website; within 45 business days after ordering in official posts. Neither proves delivery
Company expectation; not yet an achieved resultsource 030102
Miner Impact

What does it mean for miners?

AR30 connects to existing cooling, while AR31 adds a separate dry cooler and heat-recovery support. The manufacturer claims support for a 50°C water outlet on AR31; this is not our measurement or a guarantee for every site. Capacity for 20 miners does not establish that miners are included. Confirm pumps, piping, controls and installation in writing, along with temperatures, flow, power and usable heat demand.

JGM Learn Analysis

Analysis of this site

The article states shipment 45 business days after payment; official posts say within 45 business days after ordering. Both clocks are retained without assuming one supersedes the other. Confirm the starting point, equipment list, transport and arrival arrangements in the written order. Announcements and shipping expectations do not prove batch delivery. Heat recovery is not assumed income; this is not investment advice.

This section is JGM Learn's neutral interpretation of the listed sources. It is not manufacturer copy and does not guarantee returns, delivery or investment outcomes.
Primary Sources

Sources and Verification Record

Sources prioritize manufacturer websites, investor-relations releases and first-party event records. A source date is not necessarily the event date.

  1. 01
    Official AR30 deployment postGo to original source ↗

    BITMAIN · Official Release

    Accessed: 2026/11/01
  2. 02
    Official AR31 deployment postGo to original source ↗

    BITMAIN · Official Release

    Accessed: 2026/11/01
  3. 03
Update Record

Update and Correction Record

  1. Added the September 22 primary article, both payment- and order-based shipping clocks, and the AR31 manufacturer claim of a 50°C outlet. Retained September 10 sales, September 24 card publication and unverified social dates; specifications and expected shipment are not measurements, stock or delivery evidence.
  2. Added the per-set prices from the official announcements read for this review, while retaining the unknown currency code behind $ and unconfirmed system inclusions. This is not evidence of stock, delivery or a current quote. The old website article was not reread; its October 6 access date remains unchanged.
  3. Removed public direct-sale pricing and promotional embeds, retaining official sources, the original publication date and historical review notes. The now-readable article was rechecked for power, cooling and both shipping clocks; rated specifications and shipment expectations remain distinct from delivery.
Cite this page

Copy the Chinese citation, English citation or permanent URL.

  • The confirmed facts on this page are compiled from the listed original sources.
  • JGM Learn analysis is original editorial analysis by this site.
  • Manufacturer logos, product images and third-party visuals are not covered by this site's text and data citation permission.