This is not a breaking-news ranking, and manufacturer announcements are not treated as conclusions. Each record preserves its status, related models, verifiable facts, miner implications and primary sources.
Data cards
12
Manufacturer
4
Verified with primary sources
12
Editorial Highlights
Important Updates
Updates affecting products, delivery, supply chains or miner decisions appear first. All exhibitions, partnerships and manufacturer events remain in the complete timeline below.
October 28 review of the WDMS launch post: up to 600 TH/s, as low as 8.9 J/TH and expected November 2026–January 2027 shipping. Store and deployment terms need rechecking; delivery evidence remains pending.
Verified Timeline
Search and Filter All Records
Type describes the nature of the update, while status describes its current stage. Launched does not mean shipping or deployed.
Both are rated for 20 U2H miners. AR30 connects to existing cooling; AR31 adds a separate dry cooler and heat-recovery support. Compare site requirements first.
Manufacturer-rated capacity
Both: 20 U2H / 47U; verify the actual configuration
Cooling requirements
AR30 uses existing cooling; AR31 adds a separate dry cooler and heat recovery. The 50°C outlet is manufacturer-rated; verify actual site conditions
A record of the existing S23e U2H's 865T version and manufacturer-expected November 2026–January 2027 delivery window. The source lists FUTURES; named batches, spot inventory and actual delivery remain unconfirmed.
Manufacturer version covered
S23e U2H | 865T-10; 865 TH/s, 8650 W / 10 J/TH at 35°C coolant inlet; 2U hydro, not a JGM measurement
Manufacturer-expected delivery window
On October 29 the store showed Sold Out and still expected shipping from November 2026. The August 28 November 2026–January 2027 window is a historical forecast, not spot inventory; named batches/arrivals are unverified
October 28 review of the WDMS launch post: up to 600 TH/s, as low as 8.9 J/TH and expected November 2026–January 2027 shipping. Store and deployment terms need rechecking; delivery evidence remains pending.
Official launch
August 28, 2026 | WDMS Global Hong Kong
Manufacturer-rated version
October 28 check of the August 28 post: up to 600 TH/s, as low as 8.9 J/TH; 5,340 W is a September 8 product-page record
The WDMS recap confirms the S23 XP Hyd. launch and presents hydro-deployment and computing-cooperation themes. Product specifications and expected delivery have linked data cards; event dates and the official recap remain here.
Canaan announced before Bitcoin Asia 2026 that it would showcase Bitcoin computing equipment spanning enterprise and home use; no official post-event recap has been found.
Announcement date
2026/08/25
Event details in the release
August 27–28, 2026 | Hong Kong Convention and Exhibition Centre
Industry exhibition2026/07/23–24|Irving Convention Center, Dallas
A record of BITMAIN's July 2026 fleet-renewal and air-to-hydro conversion announcement, mainly targeting equipment rated 25 J/T or higher. It does not establish that the program remains active.
Announcement date
2026/07/13
Primary target equipment
Air- and hydro-cooled equipment rated 25 J/T or higher
Bitdeer announced that it had broken ground in Sparks, Nevada for its first U.S. manufacturing and assembly facility; capacity and completion timing remain company expectations.
BITMAIN provides underlying hashrate technology services for HashKey Capital's Bitcoin Hashrate Fund; HashKey later listed the fund among products it had launched.
BITMAIN's role
Underlying hashrate technology service provider
Service boundary
BITMAIN does not participate in fund management, marketing, distribution, investment decisions or profit distribution
A look back at the April 2026 A4 launch: one air-cooled model and two hydro-cooled models for different sites.
Original launch date
2026/04/07
Models
A4 Pro Air|A4 Pro Hydro|A4 Ultra Hydro
No data cards match the current filters. Clear one or more filters and try again.
Reuse & Subscribe
Citation and Data Access
Every data card has a permanent URL, Chinese and English citation formats and original sources. Use RSS to follow changes and JSON for research or data processing.